Night Emergency Dig — Cleveland, OHEmergency

Cleveland, OH

Night Emergency Dig

Challenge
A damaged utility at an urban roadside required an after-hours response.
Our approach
The crew used truck-mounted light towers and vacuum excavation to expose the utility while traffic controls maintained the work zone.
Result
The damaged utility was exposed during the overnight response.
Discuss a similar project
Industrial Trench Network — Newark, OHTrenching

Newark, OH

Industrial Trench Network

Challenge
An operating industrial plant needed trenching through compacted gravel around marked utilities.
Our approach
ABI daylighted existing lines and used hydrovac excavation to form the trench network.
Result
The facility stayed in service and the marked utilities remained untouched.
Discuss a similar project
HDD Bore Verification — Cincinnati, OHHDD Support

Cincinnati, OH

HDD Bore Verification

Challenge
A directional drilling crew needed to confirm existing utility positions along its bore path.
Our approach
Working from the paved shoulder, ABI opened sequential vacuum potholes with safety fencing along the trench edge.
Result
Utility depth and alignment were confirmed before drilling began.
Discuss a similar project
Frozen-Ground Excavation — Toledo, OHCold Weather

Toledo, OH

Frozen-Ground Excavation

Challenge
An emergency dig faced frozen ground, snowfall, and overnight winter conditions.
Our approach
The crew used heated water and vacuum excavation inside a controlled work zone.
Result
Excavation continued through the frozen ground, keeping the emergency work moving.
Discuss a similar project
Remote-Hose Confined Dig — Dayton, OHRemote Hose

Dayton, OH

Remote-Hose Confined Dig

Challenge
The excavation area was beyond the truck's reach across wooded ground.
Our approach
ABI extended remote vacuum hose from the truck to the confined work area.
Result
The crew reached the dig without a lane closure or mechanical equipment inside the work zone.
Discuss a similar project
Slurry Haul-Off — Columbus, OHDebris Removal

Columbus, OH

Slurry Haul-Off

Challenge
Excavated soil and slurry needed to be removed from an active jobsite.
Our approach
ABI collected the spoils in a sealed debris tank and hauled them to the disposal site.
Result
A single-trip haul-off cleared the spoils and left the work area clean.
Discuss a similar project
Refinery Flare-Stack Dig — Ohio ValleyIndustrial

Ohio Valley

Refinery Flare-Stack Dig

Challenge
An active refinery required nighttime excavation around live process lines.
Our approach
Crews carried out precision excavation under the facility's safety protocols.
Result
The excavation proceeded around the process lines during the night shift.
Discuss a similar project
Residential Driveway Potholing — Columbus, OH MetroUtility

Columbus, OH Metro

Residential Driveway Potholing

Challenge
A buried service line needed to be located beneath a finished concrete driveway.
Our approach
The operator used a hand-held vacuum hose to excavate a targeted opening.
Result
The service line was located while limiting disturbance to the surrounding driveway and yard.
Discuss a similar project
Trench-Shield Utility Excavation — Lancaster, OHTrenching

Lancaster, OH

Trench-Shield Utility Excavation

Challenge
A deep utility trench required controlled soil removal within a trench shield.
Our approach
ABI used the vacuum hose to clear the utility zone inside the shield.
Result
The utility zone was cleared within the protected trench.
Discuss a similar project
Rural Site Mobilization — Licking County, OHMobilization

Licking County, OH

Rural Site Mobilization

Challenge
A rural jobsite needed excavation capacity without repeated water refill runs.
Our approach
ABI mobilized a truck with a 12-cubic-yard debris tank and 1,200 gallons of onboard water.
Result
Onboard capacity kept the dig cycle moving without refill trips.
Discuss a similar project
Night Roadway Utility Exposure — Columbus, OHEmergency

Columbus, OH

Night Roadway Utility Exposure

Challenge
An after-hours roadway job needed utility exposure ahead of morning traffic.
Our approach
The crew worked from the grassy shoulder, extending the boom into the excavation area.
Result
The utility was exposed and the lane returned to service before the morning commute.
Discuss a similar project
Residential Site Work — Westerville, OHResidential

Westerville, OH

Residential Site Work

Challenge
A residential excavation required equipment staging around a finished lawn.
Our approach
ABI staged the hydrovac on the driveway and used its onboard water and debris capacity.
Result
The truck stayed off the lawn and the dig progressed without extra trips.
Discuss a similar project
Frozen-Ground Winter Dig — Chillicothe, OHCold Weather

Chillicothe, OH

Frozen-Ground Winter Dig

Challenge
Winter conditions had stopped mechanical excavation at a utility site.
Our approach
ABI used heated-water hydrovac excavation to work through the frozen ground.
Result
The winter utility dig continued despite the ground conditions.
Discuss a similar project
Directional Drill Site Support — Newark, OHHDD Support

Newark, OH

Directional Drill Site Support

Challenge
An HDD crew needed existing utilities exposed before starting a bore on a building site.
Our approach
ABI potholed the bore path while the directional drill staged nearby.
Result
Existing utilities were exposed before drilling began.
Discuss a similar project
Fire Suppression Line Exposure — Delaware, OHEmergency

Delaware, OH

Fire Suppression Line Exposure

Challenge
A damaged fire suppression line required emergency access after hours.
Our approach
The crew vacuum-excavated a deep, narrow cut and cleared soil from the line.
Result
The line was exposed so the repair crew could begin work that same night.
Discuss a similar project
Residential Sewer Line Repair — Pickerington, OHUtility

Pickerington, OH

Residential Sewer Line Repair

Challenge
A failed clay-tile sewer line lay beside a home's foundation and near a gas service.
Our approach
Vacuum excavation opened access to the sewer while keeping the dig clear of the adjacent gas service and meter.
Result
The excavation provided access for removal of the old sewer sections and placement of the replacement line.
Discuss a similar project
Roadway Utility Daylighting — Zanesville, OHUtility

Zanesville, OH

Roadway Utility Daylighting

Challenge
A muddy roadside trench contained multiple existing utility lines.
Our approach
ABI worked from the shoulder and vacuumed slurry from the utility exposure at dusk.
Result
The trench was cleared while the roadway remained open to traffic.
Discuss a similar project
Downtown Street Exposure — Columbus, OHUtility

Columbus, OH

Downtown Street Exposure

Challenge
A utility access point between downtown storefronts required a focused excavation.
Our approach
The hydrovac boom worked the access point on the street.
Result
The utility exposure was completed with limited disruption to nearby businesses.
Discuss a similar project
Protected Trench Coordination — Dublin, OHTrenching

Dublin, OH

Protected Trench Coordination

Challenge
Commercial-site utility work needed a clearly controlled excavation area.
Our approach
Crews coordinated trench work within a marked caution perimeter.
Result
Utility work proceeded with access to the trench area controlled.
Discuss a similar project
Cold-Weather Muddy Excavation — Mansfield, OHCold Weather

Mansfield, OH

Cold-Weather Muddy Excavation

Challenge
Wet conditions left a commercial-site utility trench waterlogged.
Our approach
ABI used high-flow vacuum removal to clear water and slurry while the crew stayed outside the exposure.
Result
The trench was kept clear as excavation continued.
Discuss a similar project
Dusk Mobilization — Columbus, OHMobilization

Columbus, OH

Dusk Mobilization

Challenge
An active building site required excavation support late in the day.
Our approach
ABI mobilized the truck and used light towers to support boom work at twilight.
Result
Excavation continued into the evening.
Discuss a similar project
Deep Pothole Verification — Columbus, OHPotholing

Columbus, OH

Deep Pothole Verification

Challenge
Upcoming work required confirmation of utility depth and alignment beneath a concrete pad.
Our approach
ABI opened a targeted pothole and used the vacuum hose to clear the exposure.
Result
The exposed utility could be checked for depth and alignment before the next phase of work.
Discuss a similar project
06
Built for contractors

A Long-Term Hydrovac Partner

ABI Hydrovac supports the utilities and contractors who keep critical infrastructure moving. Explore how our crews can support your next project.

Utility & Pipeline Contractors

Daylight crossings, verify buried lines, and support HDD crews in congested utility corridors.

Pipeline support

Industrial & Commercial Projects

Plan controlled excavation around active facilities, substations, and constrained sites.

Industrial capabilities

General Contractors & Municipalities

Get a single hydrovac partner for potholing, narrow excavation, water and sewer exposure, and field coordination.

Municipal services

Have a project in mind?

Send us the scope — we'll quote it fast.